Thursday, September 10, 2015

September 10 -- OK, Just One More....

We will rebuild one (or two) last retaining wall(s). With all the others reworked and improved, the ones that looked satisfactory now look shabby.

This is the wall to the right of the driveway and the wide steps. We have a lot of wiring and septic lines traversing this area, so we've opted for a dry-stack approach if we ever need quick access to those utilities.

Once again, these are some big rocks.




Wednesday, September 9, 2015

September 9 -- Exterior Garage Lighting

When the original light selected for the bar didn't quite work, Char had the inspiration to repurpose it for the garage, and get other lighting to match.

Below and to the right, in the breezeway, is the original bar light selection:

The over-the-garage-door lights and other people-door lights:




Saturday, September 5, 2015

September 5 -- New Year's Gift

"New Year's Gift" was the previous name of our home before my family acquired it in the late 1960s. This real estate ad, rediscovered today, seems to hail from the mid-60s: after the last major renovation that added the new kitchen, master bedroom, and dining room. Note that the carport (which we demolished this year) did not exist (look far left of top photo) at the time this ad ran.


Friday, September 4, 2015

September 4 -- Tidier

The stumps of the old cedar tree and quince apple tree, which had to be removed to make space for the garage, were hauled away today.




September 4 -- Wall Progress

The old capstones will be reused; they just aren't set in mortar yet.







Thursday, September 3, 2015

September 3 -- Driveway Retaining Wall Takes Shape

Last week's worms-eye view:

Block in place as of Tuesday:

Yesterday's progress on facing the wall with stone:


Wednesday, September 2, 2015

September 2 -- Tank Excavation

We knew this old abandoned water tank was in the ground near the old well and the log cabin, but were trying to avoid digging it out. But the change in grade around the area necessitated excavation.

Step One was to dig around the tank by hand.

Step Two was to attach chain to the edges and the square hole shown above, and rock it up and out using the JD 990.


Step Three was to saw it in half, dig out all the earth within, and lighten the halves for removal.