Tuesday, April 28, 2015

April 28 -- Weathered Vane

We have had this old weather vane in our garage for literally decades: recovered from a hotel property acquired in the late 1980's. Its restoration began today, the only question is on which peak it will be mounted.


Or...?


This is the lower portion, complete with compass points:


This is the upper portion, wing span is about 4':
 





April 27 -- "Day... of the Dormers!"

Installation of the garage dormers begins!




Friday, April 24, 2015

April 24 -- Breezeway Takes Shape

This breezeway will be connected to the smoke house, and we may hang an antique bell we've had for decades in the rafters.


April 24 -- Roof in Place

The view to the southwest:

The whole thing, looking northeast:

Friday, April 17, 2015

April 17 -- Header Feature

This was completed weeks ago, regrets for the delayed posting.

I found some stunning cedar planks in the attic, measuring 1"x14" but over 16 _feet_ long. An attic window had to be removed just to get them out for use below. They act as a header and "container" for the rolling screen and its track.






April 17 -- Patio Progress

Stonework on the back patio has resumed!


Thursday, April 16, 2015

April 16 -- A Post About....Posts

Kevin is really cooking now: the entire east side of the garage has the post and beam feature installed.



Some detail photos, just taken:


The garage will have a ceiling, so only the exterior parts of the milled posts and logs will be exposed. Note how some of the bark and imperfections of the lumber will be visible:


The eastern inside corner:


The southeast corner:







April 16 -- Proof of Concept

Having figured out (mostly) how to approach the timbers trim on the garage, Kevin is moving full speed ahead.






Monday, April 13, 2015

Sunday, April 12, 2015

April 12 -- One Heavy Rock

I found this stone elsewhere on the property that I want to include somewhere in the garage wall. It is really heavy.




April 12 -- Watching Wood Dry

I was asked to uncover the milled lumber to help it dry in the warm spring sunshine.






Saturday, April 11, 2015

April 11 -- Repairs

We continue to have some moisture seeping in along the library's north wall. So, the earth has been dug away so the DryVit material could be parged. Hope this works.


April 11 -- Radiant Floor Heat Controls Detail

April 11 -- Beam Detail

Using the old elm we just milled, we are emulating the look of the smoke house on the new garage. The area connecting the two bay areas:


The beams on the smoke house:


And, these are some of the 8" beams just milled that we will be using:






Thursday, April 9, 2015

April 9 -- All Trussed Up

Ok, I think I've run out of "truss" puns.

Half of the area above my garage bays will be used for holiday decorations storage, etc. The "void" you see in the trusses below allow for a 14'x16' attic space.




April 6 -- Plywood on the Framing

Today's progress.

View from the southeast garage corner:

The breezeway view west:

The view south, showing list of the back of the garage: