Wednesday, September 30, 2015

September 30 -- Set In Stone

The concrete is dry enough to lay on, without getting stuck (I think).


The boys have left a lasting impression. This area will get flagstone atop it in the next few days.


The steps are done, and wiring is ready for riser lighting.



September 29 -- More Walk Work

Foundation pouring for the walkway areas begins today.


September 29 -- Access

Gravel was spread into the gap between the garage floor and the existing paving, allowing garage access for our vehicles.




We could have done this weeks ago, I realize now.


Thursday, September 24, 2015

September 24 -- Realignment

On second thought, we've decided to square the widened walkway up with the door. Designs for an expanded porch landing are underway, because we just can't conceive of finishing this renovation.


The walk originally led to three steps which were where the exposed block is shown below.



Tuesday, September 22, 2015

September 21 -- Garage Paint Scheme



September 21 -- Camouflage

The unsightly improvements to the septic system received some new camouflage today: a few new laurel bushes, and a heap of the extra rocks, all washed down to highlight the variations in the stone. 

(Senior Inspector is in the background assessing the view from that side).



And, the Inspector's view:







Saturday, September 19, 2015

September 19 -- Wider

The improved walkway will also be about a foot wider than before.


Here the same angle, but with an Inspector included for scale.



September 19 -- Walk Work

The walkway excavation continues. 


Friday, September 18, 2015

September 18 -- Stepping It Up

The new paving affects the grade such that the steps need reworking, and is an opportunity to deepen and widen the treads. 

Senior Spector wonders why the team knocked off early.




September 17 -- Markings

Bids are coming in to repave, and widen, the driveway around the garage.




Tuesday, September 15, 2015

Monday, September 14, 2015

Friday, September 11, 2015

September 11 -- Dry Stack Wall Progress

The line of the wall has been established, and lots of smaller stones are going in to backfill. The cap stones we will reuse are just off-camera.

The Junior Inspector wonders why no one has shown up to work yet.

The extra stone is also being staged along the driveway for the next area to get the wall treatment, so that the left bank will match the right bank.

End of the day update:









Thursday, September 10, 2015

September 10 -- OK, Just One More....

We will rebuild one (or two) last retaining wall(s). With all the others reworked and improved, the ones that looked satisfactory now look shabby.

This is the wall to the right of the driveway and the wide steps. We have a lot of wiring and septic lines traversing this area, so we've opted for a dry-stack approach if we ever need quick access to those utilities.

Once again, these are some big rocks.




Wednesday, September 9, 2015

September 9 -- Exterior Garage Lighting

When the original light selected for the bar didn't quite work, Char had the inspiration to repurpose it for the garage, and get other lighting to match.

Below and to the right, in the breezeway, is the original bar light selection:

The over-the-garage-door lights and other people-door lights:




Saturday, September 5, 2015

September 5 -- New Year's Gift

"New Year's Gift" was the previous name of our home before my family acquired it in the late 1960s. This real estate ad, rediscovered today, seems to hail from the mid-60s: after the last major renovation that added the new kitchen, master bedroom, and dining room. Note that the carport (which we demolished this year) did not exist (look far left of top photo) at the time this ad ran.


Friday, September 4, 2015

September 4 -- Tidier

The stumps of the old cedar tree and quince apple tree, which had to be removed to make space for the garage, were hauled away today.




September 4 -- Wall Progress

The old capstones will be reused; they just aren't set in mortar yet.







Thursday, September 3, 2015

September 3 -- Driveway Retaining Wall Takes Shape

Last week's worms-eye view:

Block in place as of Tuesday:

Yesterday's progress on facing the wall with stone:


Wednesday, September 2, 2015

September 2 -- Tank Excavation

We knew this old abandoned water tank was in the ground near the old well and the log cabin, but were trying to avoid digging it out. But the change in grade around the area necessitated excavation.

Step One was to dig around the tank by hand.

Step Two was to attach chain to the edges and the square hole shown above, and rock it up and out using the JD 990.


Step Three was to saw it in half, dig out all the earth within, and lighten the halves for removal.