Monday, October 27, 2014

Thursday, October 23, 2014

October 23--Experiments in Lighting

Today Charlene and the team worked on lighting placement and fixture sizes.


October 23--Two Stories of Stone

I never tire of this view. Someday soon the spiral staircase will be installed here, and this angle looking upward from the first floor will become impossible to capture.


October 22--Chandelier Template

Using an old Amazon box, Charlene cut out shapes to mimic the dimensions and hanging height of the chandelier we intend to install in the expanded room. Although low -- and while we do plan for a table beneath the fixture -- there is enough clearance for us to walk under it and not hit our heads.


October 20--Retracting Door System Installed

Here is the door system installed. The left-hand door swings out to the left; the other three doors fold upon themselves and slide to the right. This will give us a roughly 12' opening when fully opened.


The view of the full room standing from the bar area:



Monday, October 20, 2014

Sunday, October 12, 2014

October 10--Radiant Floor Heat

Given the stone walls in the 1788 section, it is difficult to run baseboard heat for the second floor hallway and the bath. Solution: radiant heat channeled through the floor.


Monday, October 6, 2014

October 6--More Big Rocks

When excavating for the new crawl space access, these stones were removed, and will get re-used for the garage exterior, hopefully. Here are the biggest two, just added to our pile.




October 6--Crawl Space Access

Having created a useable crawl space from the cellar to under the 1788 area, we thought it wise to have a good access to it. This is the new 2'x2' access to the crawl space, using old brick and sections of the removed I-beam for support. The pre-existing crawl space is also below, and its more jagged edges will also get refined somewhat, if our builder can get past all the wiring, piping, and guts.