Wednesday, September 2, 2015

September 2 -- Tank Excavation

We knew this old abandoned water tank was in the ground near the old well and the log cabin, but were trying to avoid digging it out. But the change in grade around the area necessitated excavation.

Step One was to dig around the tank by hand.

Step Two was to attach chain to the edges and the square hole shown above, and rock it up and out using the JD 990.


Step Three was to saw it in half, dig out all the earth within, and lighten the halves for removal.






September 2 -- Drain Pipe Update

Two new 7" drain pipes were installed under the driveway today, and stone was back-filled prior to repaving.

The Junior Inspector approves.


September 2 -- Traffic Light Prep

A feature for the garage I've been anxiously awaiting to start: installation of an old traffic light!


September 2 -- Excavating for New Drain Pipe

Tough day for this project to occur: highs expected to be in the mid-90s.








September 2 -- Lounge Shelving

Finishing touches for Ava's lounge are in; paint is next.




Tuesday, September 1, 2015

September 1 -- The Big Cure

Char's bay:


My bays:





September 1 -- The Big Pour

Today the slab goes into the garage.





Final prep work on the garage door jambs:


The Fleet (which can't go into the space until Sunday) has been moved to a safe distance.