Monday, January 18, 2016

January 18 -- New Wall Nearly Done

There should be a couple more courses laid, but this wall is nearly complete. We have set it out a bit farther to accommodate a lawn mower to maintain the grass between the driveway and the wall.


Thursday, January 14, 2016

January 14 -- Softening the Slope

January 13 -- More Wall Action

This week the slope along the driveway saw the excavation of long-buried rocks, which will be restacked to form a retaining wall along this side of the driveway circle. That cube-like rock by the cedar tree? It measures roughly 18"x18"x12". I hope that can become the end stone for the section of wall nearest the house. Also discovered: a rough slab at the north end.





Monday, November 30, 2015

November 30 -- Moving On

This is the final first floor window being replaced. The upstairs windows will be replaced later this week and mostly under cover of the front porch roof.


Wednesday, November 25, 2015

November 25 -- Thankful, Part Two

A year ago today, we were thankful for timely drywall deliveries. This year, I'm thankful for the ongoing replacement window installation.

The two library windows that look out into the patio are nearly completed:



View of the front. Second floor windows go in next week. Spot the celebratory Campari cocktail.


Old sashes, pullies, and counterweights are all removed as we go along.




Monday, November 23, 2015