Monday, November 30, 2015

November 30 -- Moving On

This is the final first floor window being replaced. The upstairs windows will be replaced later this week and mostly under cover of the front porch roof.


Wednesday, November 25, 2015

November 25 -- Thankful, Part Two

A year ago today, we were thankful for timely drywall deliveries. This year, I'm thankful for the ongoing replacement window installation.

The two library windows that look out into the patio are nearly completed:



View of the front. Second floor windows go in next week. Spot the celebratory Campari cocktail.


Old sashes, pullies, and counterweights are all removed as we go along.




Monday, November 23, 2015

Saturday, November 14, 2015

November 13 -- "Nothing To See Here."

And, that's the point. Over the years we had to run cable, wiring, etc. through a chase parallel to this downspout that fed signal or power from the basement to the roof, and then to other parts of the house. The renovation has streamlined all that supply, so all the now-redundant wires have been removed, along with the chase.


Friday, November 13, 2015

November 13 -- Just Like Old Times

Many contractors on-site today for punch list ops, exterminator treatment, and window installation.