Tuesday, August 11, 2015
August 11 -- Stucco Ops Begin
Yesterday scaffolding was installed, Tyvek was re-applied, and windows and trim were covered on the garage surface in advance of foam insulation and stucco application.
Friday, August 7, 2015
August 6 -- Bar Lighting Tweaks
The new replacement light fixture went in this week, the superfluous wiring for the nixed pendant lights has been removed, and the ceiling patched as needed. A couple of switches need to be swapped out (black for white), but then, I think we are 100% complete on the bar.
Sunday, August 2, 2015
August 1 -- Garage Insulation
Insulation was sprayed into the eaves and rolled into the framing yesterday. Char's bay:
The long view into my bays:
Friday, July 31, 2015
Thursday, July 23, 2015
July 23 -- Pasta Faucet
We have wanted to install a faucet above the range for convenient filling of pots. This proved a delicate challenge: drilling through the wall, avoiding the electrical, and NOT damaging the tile (especially since we have very few spare tiles).