August 11 -- Stucco Ops Begin

Yesterday scaffolding was installed, Tyvek was re-applied, and windows and trim were covered on the garage surface in advance of foam insulation and stucco application. 

The view toward my bays:


Eastern face of my bays:


Char's bay is to the right, with Junior Inspector making note of the crew's pre-dawn arrival time:


The rear view:





Friday, August 7, 2015

August 7 -- Garage Drywall Ops

Wednesday:


Thursday:

Char's bay (or is it the outhouse?):


Passage way between bays:


The double bay:






August 6 -- Bar Lighting Tweaks

The new replacement light fixture went in this week, the superfluous wiring for the nixed pendant lights has been removed, and the ceiling patched as needed. A couple of switches need to be swapped out (black for white), but then, I think we are 100% complete on the bar.




Sunday, August 2, 2015

August 1 -- Garage Insulation

Insulation was sprayed into the eaves and rolled into the framing yesterday. Char's bay:


The long view into my bays:


The view into my bays (and Char's on the right) from the double door area: 



July 31 -- Trip Around the Kitchen

Details of new counter tops....

...with home-grown sunflowers:


...with new range hood in place:


....and with the "Office Bin":


Only the long, L-shaped stainless steel sink section remained unchanged.




Friday, July 31, 2015

July 31 -- Pot Filler In; New Counters In

One year ago today, we got our belated building permit.

Today, the kitchen's final touches went it.


Thursday, July 23, 2015

July 23 -- Pasta Faucet

We have wanted to install a faucet above the range for convenient filling of pots. This proved a delicate challenge: drilling through the wall, avoiding the electrical, and NOT damaging the tile (especially since we have very few spare tiles).