Wednesday, September 2, 2015

Tuesday, September 1, 2015

September 1 -- The Big Cure

Char's bay:


My bays:





September 1 -- The Big Pour

Today the slab goes into the garage.





Final prep work on the garage door jambs:


The Fleet (which can't go into the space until Sunday) has been moved to a safe distance.






Monday, August 31, 2015

Friday, August 28, 2015

August 28 -- Lounge Act

Panelling for Ava's lounge was completed today. 

Before:

After:

The 1788 chimney....

...is now behind this wall:

This room was always unconditioned space. Now, the new standalone HVAC unit is whisper-quiet:


August 28 -- In the Trenches

With rebar in-place, footings for the to-be-rebuilt wall will be poured soon. Not really sure where this drain pipe lets out, or for that matter, where the copper water line leads. These were, unfortunately, the only discoveries in this particular archeological dig site.





Wednesday, August 26, 2015

August 26 -- Sure Footing, Part Two

A proper footing will be poured for the rebuilt stone retaining wall. There never was one, which accounts for the heaves in the past. The slab you see covers the old (original?) well head. 


The inspectors approve.